Benefits

The rendering company is a so-called zero-waste plant. The final products (meat and bone meal and fats will be used as fuel to produce energy). The waste water is locally purified to river-quality water. The installation also holds positive consequences for the Serbian economy. During the first stage, 43 employees were recruited. Employment will also rise as processing volumes increase - up to 100 jobs. 

In the long term, the controlled processing of ABPs will enable Serbia to export meat products to foreign markets. In addition, this is also a requirement to the EU admission.

The initial investment reached EUR 21.5 million.

 

Contact

Contact

Tel. (general):
+381 22 800 450

Tel. (supply and logistics): +381 22 800 454

Energo-Zelena d.o.o.
Zeleznicka bb
22 320 Indjija, Serbia
www.energozelena.rs
This email address is being protected from spambots. You need JavaScript enabled to view it.

Energo Zelena...

Energozelena
 

 

…is rendering plant owned by Republic of Serbia.

…is the only state-of-art rendering facility for hazardous ABP treatment in Serbia and the Balkan region (with the exception of Croatia).

…the processing capacity of the plant is 150,000 tons of hazardous ABP and it combines realistic market capacities for hazardous ABP and capacities for emergency situations.

…is fully compliant with both Serbian and EU laws and regulations. 

…has initially invested EUR 21,5 million into a rendering plant in Indjija. 

…is a zero waste plant. 

…is socially responsible company.

…employees 43 people and it will rise as the processing volumes increase – up to 100 employee.

...proper treatment of hazardous ABP is a corner stone for sustainable meat and dairy industry.