Energo Zelena, rendering plant
Energo Zelena, rendering plant
Indjija
Energo Zelena, rendering plant
Energo Zelena, rendering plant
Indjija
Energo Zelena, trucks
Energo Zelena, trucks
Indjija
View from control room
View from control room
Energo Zelena
Energo Zelena, rendering plant
Energo Zelena, rendering plant
Machinery
Energo Zelena, rendering plant
Energo Zelena, rendering plant
Machinery
Energo Zelena, rendering plant
Energo Zelena, rendering plant
Tank farm
Previous Next Play Pause
1 2 3 4 5 6 7

Company Energo Zelena

has constructed the first rendering company for hazardous animal by-products (ABPs) treatment in Serbia in accordance with the strictest environmental and safety standards.

Designed capacity of the facility is 150,000 tons of ABPs. The capacity combines realistic market capacity in Serbia (around 110,000 - 115,000 tons of hazardous ABPs per year), i.e. the quantities of hazardous ABPs that are being generated on the market every year plus capacities for emergency situations.

Energo Zelena has set up its own transport system for this purpose.

The end products (meat and bone meal and tallow) will be used as fuel to produce energy. 

Energo-Zelena received IPPC permit

On May 11th 2015 the ceremony for the handover of the IPPC permit by representatives of the Provincial Secretariat for Urban Planning, Construction and Environment protection to the representatives of Energo Zelena took place at the premises of Energo Zelena in Indjija. 

The IPPC permit is another official confirmation that Energo Zelena meets the most stringent requirements in the area of environmental protection. With this Energo Zelena became the first facility processing animal by-products in Serbia with IPPS permit. In Serbia 174 existing facilities are required to possess the IPPC permit but Energo Zelena is only the 7th company in Vojvodina and the 11th company in Serbia receiving this IPPC permit.

However, obtaining this IPPC permit does not mean Energo Zelena will now restart its operations neither does the IPPC permit affect the pending arbitration against the Republic of Serbia.

 

VIP agency ranked among top 10 IPA agencies on UN's World Investment Forum in Geneva

Forum Geneva Small 1941

Agency nominated Energo Zelena's investment project for prestigious competition

It is our pleasure to announce that Vojvodina Investment Promotion agency is ranked among top 10 IPA agencies at the Investment Promotion Awards 2014 organized by UNCTAD, UN Conference on Trade and Development. VIP agency nominated the investment project of company Energo Zelena for this competition. The focus of this year’s competition was on “green” investments.

Read more...

Press Release - Energo Zelena presented its state-of-the-art plant that processed more than 650 tons of CAT 1 animal waste during floods

News 15 S Press Release En

Energo Zelena, the first and currently only CAT 1 rendering plant for hazardous animal waste (animal by-products – ABP) treatment in Serbia and region (with the exception of Croatia) that fully complies with both Serbian and EU legislation opened today its state-of-the-art facility in Indjija to journalists for an organized visit. The management of the Company reported that more than 650 tons of CAT 1 animal waste from flooded areas in Serbia and Bosnia and Herzegovina have been processed in this plant so far, adding that more waste from some areas is still to come.

Read more...

Press Release - Energo-Zelena announces New Shareholder Structure

News 10 S Saopstenje Sr

Proper CAT 1 animal byproducts Treatment in Serbia is now possible and should be enforced.

Energo-Zelena doo announces a significant change of ownership of its Belgium based mother company Zelena nv. Its majority shareholder Electrawinds nv divested and has been replaced by Greenworx Holding nv, a Belgium based renewable energy development company and Saffelberg Investments nv, a Belgium based investment fund with significant investments in renewable energy projects. The transaction combines the purchase of Electrawind’s shares as well as a significant equity increase.

Read more...

3D Virtual Tour

3D virtuelna tura

Contact

Contact

Tel. (general):
+381 22 800 450

Tel. (supply and logistics): +381 22 800 454

Energo-Zelena d.o.o.
Zeleznicka bb
22 320 Indjija, Serbia
www.energozelena.rs
This email address is being protected from spambots. You need JavaScript enabled to view it.

Energo Zelena...

Energozelena
 

 

…is rendering plant owned by Republic of Serbia.

…is the only state-of-art rendering facility for hazardous ABP treatment in Serbia and the Balkan region (with the exception of Croatia).

…the processing capacity of the plant is 150,000 tons of hazardous ABP and it combines realistic market capacities for hazardous ABP and capacities for emergency situations.

…is fully compliant with both Serbian and EU laws and regulations. 

…has initially invested EUR 21,5 million into a rendering plant in Indjija. 

…is a zero waste plant. 

…is socially responsible company.

…employees 43 people and it will rise as the processing volumes increase – up to 100 employee.

...proper treatment of hazardous ABP is a corner stone for sustainable meat and dairy industry.